工地大门设置要求:

Requirements for setting up construction site gates:

1、地面安全防护棚架的搭设高度、立柱的布置间距满足来往人员的通行要求。

1. The height of the ground safety protection shed and the spacing between the columns should meet the requirements for the passage of personnel.

2、施工材料的运输尽可能安排夜间进行。

2. The transportation of construction materials should be arranged at night as much as possible.

3、施工场地内的便道按照厂区道路位置进行布置,根据现场踏勘情况,对场地平整后,铺设25厘米道渣,经压路机碾压后作为施工便道使用。便道宽4米,便道两侧设置排水沟。

3. The access roads within the construction site are arranged according to the location of the factory roads. Based on the site survey, after leveling the site, 25cm of ballast is laid and used as construction access roads after being rolled by a road roller. The access road is 4 meters wide and drainage ditches are installed on both sides of the road.

4、设进出大门和道路贯通。路口设置安全指示标志,夜间设置照明设施和挂设红灯,禁止外来车辆出入。

4. Set up entrance and exit gates and connect roads. Set up safety signs at intersections, set up lighting facilities and hang red lights at night, and prohibit foreign vehicles from entering and leaving.

5、在施工过程中,在施工便道上不得堆积材料和停放机械,24小时保持道路双畅通。

5. During the construction process, materials and machinery must not be piled up or parked on the construction access road, and the road must be kept clear 24 hours a day.

9c0c82ad5f765cfaaeb0407b924a76a

6、施工期间有大量的土方运输车辆,为提率,结合实际情况,在施工场地内设立车辆调头处。

6. During the construction period, there are a large number of earthwork transportation vehicles. In order to improve efficiency and based on the actual situation, a vehicle turning point is set up within the construction site.

7、因基坑开挖,有可能造成便道塌陷的,必须做好保护措施,并设置安全警示标志。

7. Due to excavation of foundation pits, it is possible to cause collapse of access roads, and protective measures must be taken and safety warning signs must be set up.

8、在便道边实施基坑开挖施工,必须设护栏围护,夜间开启足够的照明灯并设红灯示警。

8. When excavating a foundation pit at the roadside, it is necessary to set up guardrails for protection, turn on sufficient lighting at night, and set up red lights for warning.

9、场内翻斗车定人定车持证上岗,并定期检查维修刹车、转向系统等。

9. On site dump truck, personnel and vehicles must be designated and certified to work, and regular inspections and maintenance of brakes, steering systems, etc. must be carried out.

10、便道每天派人清扫,保证清洁、畅通。

10. Send people to clean the sidewalk every day to ensure cleanliness and smoothness.

11、场内交通由专人负责,如有违规现象,及时制止,必要时处以罚款。

11. The on-site traffic is managed by a dedicated person. If there are any violations, they will be stopped in a timely manner and fines will be imposed if necessary.

12、对施工用车发放通行证进行管理,施工前组织驾驶员熟悉场地及行车路线。

12. Manage the issuance of permits for construction vehicles, and organize drivers to familiarize themselves with the site and driving routes before construction.

13、保证围护周边的环境卫生,保证施工便道的平整,并经常进行养护以保证通行车辆安全。

13. Ensure the hygiene of the surrounding environment, ensure the smoothness of the construction access road, and regularly maintain it to ensure the safety of passing vehicles.